Thursday, August 18, 2022

Heavy Rains & Culverts

Hello Storm Mountain,

With the heavy rains this last week, please consider checking that the culvert on your private driveway is draining properly. The culverts can get clogged very quickly in the heavy rains and diverting water from the public right of way saves us all money. Reach out to the PID if you need assistance cleaning your culvert and we’ll see if we can connect you with a volunteer willing to help. 

Thank you!
Connie Garrett
Secretary, Storm Mountain PID #55
stormmountainpid@gmail.com
970-429-5350

Friday, August 5, 2022

Road Work Update for August

Hello Storm Mountain, 


The contractor has completed grading and ditching in the lower filings.  We have a lot of work scheduled in August, so expect to see the crew working around the mountain.  The scheduled work is detailed below and will adjust based on weather and availability of materials.


August 8-12

  • Grade the upper filings
  • Put road base on trouble areas
  • Patch chip seal on the Access Road
  • Trim trees back from public right of way


August 15-19

  • Continue grading and ditching in upper filings
  • Continue to spread and compact road base in trouble areas
  • Clean culverts

Mag chloride will be applied from Lakeview to Snow Top/Palisade intersection later in the season, and we will share specific dates when we have it. Please drive cautiously around work crews, and allow yourself extra time to get to your destination safely.


Have an excellent weekend!

Connie Garrett 

Secretary

Storm Mountain PID #55

stormmountainpid@gmail.com

970-429-5350

Monday, July 25, 2022

PID 2022-07-09 Annual Owner and Advisory Board Meeting Minutes

July 9, 2022 

Recording – the recorded meeting is available via the following links: 

Board Members 
Andy Hitch, Chairperson 
James Toland, Treasurer 
Connie Garrett, Secretary 
Joe Leo, Advisory Board Member 
John Lodico, Advisory Board Member 

The meeting was started by suspending Robert’s Rules. The Annual Owners meeting and Advisory Board meeting will be blended into one meeting. Board members introduced themselves and officer roles were re-confirmed. 

Grant Status – The board applied for a federal grant to improve materials on the Access Road through the Community Project Funding. The project was not awarded a grant; however, we will continue to look for grant opportunities and will reach out to community members that have experience in obtaining federal grants. There was some discussion on doing a GoFundMe to raise money for a specific road project. 

2022 Budget – The 2022 budget was reviewed and approved. The slides from the budget review are provided below. While the 2022 budget is more than 2021, there is concern that inflation will impact the budget. The board will discontinue allocating the budget by zones on the mountain, and instead will focus on main routes and roads that require the most work based on traffic and condition of the road. An analysis of traffic counts was performed by the county in 2021; the results of that traffic count are included below the budget slides. The PO Box will be discontinued to save money; the board will request a free eBox. 









Traffic Count Results from 2021 Analysis 
  • Access Road: 800 trips/day 
  • Palisade from T to Snow Top: 420 trips/day 
  • Storm Mtn from T to Lakeview: 470 trips/day 
  • Snow Top past Galena Ct: 260 trips/day 
  • Lakeview: 220 trips/day 
  • Storm Mtn from Y to hi-lo: 256 trips/day 
  • Strom Mt from hi-lo: 160 trips/day 
  • Cedar Park from hi-lo: less than 100 trips/day 





Winter Sanding – There was discussion on the cost of plowing. Storm Mountain pays a premium for services in part due to the insurance that contractors are required to have with the county, and due to the high-cost equipment required to perform work on Storm Mountain. Sanding was a contributing factor for the overall cost of plowing. 60 tons of sand was applied to the Access Road this last winter season. Too much sand has a negative impact on chip seal and road base and is also considered ineffective during an active snow event. The residents present at the meeting supported less sanding due to cost and negative impact on chip seal/road base; however, a poll will be sent to the community to get more feedback. 

Summer Projects – the board drove all 27 miles within the district to identify areas that required work. Projects were identified; cost estimates and priorities were assigned. Drainage is a high priority for 2022: culverts and ditches help prevent erosion and extend the life of road base. Culverts that cross the public right of way are within the PID district. The PID will not purchase culverts for private driveways, but this may be considered on a case-by-case basis depending on the impact to the public right of way. Foster Dirt will patch some areas of the chip seal this season; most of the chip seal budget will be reserved for 2023. The Access Road received a mag chloride treatment in the early summer. An additional mag chloride treatment will be applied in the fall. 

PID Website – a new website for the PID is available and was created at no cost. The address is https://stormmountainpid.blogspot.com/ Documents and information will be available on the web site. Questions and concerns can be submitted via the web site. The board will transition into using this site as the primary source of information. Future PID communications via email and social platforms will point to this website. Note: the county also stores public PID information on the Larimer County website. Monthly statements will be available on the county website after August 10th. The Larimer County PID website address is here: https://www.larimer.gov/engineering/improvement-districts/more-info 

Additional Comments – There were no additional comments for discussion. 

Thank you, 
Connie Garrett 
Secretary 
Storm Mountain PID # 55

Thursday, June 30, 2022

PID 2022 Annual Owner and Advisory Board Meeting

 Hello Storm Mountain,


We will be having our Annual Owner and Advisory Board Meeting on July 9, 2022 at 10:00 AM.  We will review and approve the 2022 budget and discuss road projects.  Please bring your own chair if you plan to attend in person.  See below for details.

Storm Mountain PID #55 2021 Annual Owner and Advisory Board Meeting
Date and Time: 7/9/22 10:00 AM
Location: Fire Station 9, 100 Palisade Mountain Dr, Drake, Colorado 80515
Dial In Number: (727) 731-2388 (Note: Press *6 to unmute yourself)
Video and Screen Sharing:
Online meeting ID: conniekgarrett
Instructions: At the scheduled date and time of the meeting, dial in to the conference line. To join the video and screen sharing session, click the online meeting link.

Thank you,
Connie Garrett
Secretary, Storm Mountain PID #55
970-429-5350
PO Box 314, Drake, CO 80515

Thursday, June 23, 2022

Summer Road Work


Foster Dirt was selected by the county to perform our summer work.  Justin Foster and his team have been supporting our community for a few years.  

Please be careful and courteous on the roads as the Foster Dirt team works.  If you have any questions, comments or requests,  please focal point them through the PID.  stormmountainpid@gmail.com 


The warm season road work is underway,  a quick summary of planned work: 


  • First priority - Access Road
    • Grade and mag-chloride the access road  -  We are planning an early and late season application of mag-chloride in an effort to improve road surface quality 
    • Address any drainage issues impacting access road 

  • Phase 1:  - Grading
    • Grade high traffic volume roads - upper and lower filings
    • Apply mag-chloride on high traffic trouble areas; Near the T,  Near the 4 way on Palisade, high grade area on Lakeview/Storm Mountain drive   (We may consider a 2nd application in the fall as budget permits) 

  • Phase 2:  - Grading 
    • Touch-up grading high volume roads as needed  
    • Grade remaining lower volume roads in upper and lower filings 

  • Phase 3 - Project Work
    • Clean and repair ditches and culverts as needed 
    • Apply road base on damaged road sections as budget allows  - priority to high traffic areas 
    • Clean up down timber / encroaching timber as needed 

  • Season Close-out work 
    • Patching of damaged chip seal
    • Grade and mag-chloride on Access Road
    • Touch-up grading on high volume roads,  potential to apply mag-chloride if budget permits 
    • Request to Snow plow contractor to fill Sand Barrels as needed 

Welcome to the Storm Mountain PID Blogger

We have setup a blog to support more direct communication to the residents and owners on Storm Mountain.  


Communications will be focused on upcoming PID meetings, planned work, and work underway. 


Please use the contact the PID form (located to the right, on the main page) if you have any questions or comments  



Winter Plowing Update:

The County has finalized contracting with a local company to complete plowing for PID #55 (Storm Mountain).   Scope of services remains near...